• Pit depth – 4′-0″ min. is standard.
  • Min. clear overhead required (based on 8′-0″ high cab):
    For up to 100 FPM = 11′-10″.
    For 100 FPM and over = 12′-1″.
    If available overhead clearance is less than above, cab height can be reduced according to code minimum.
  • Total hoistway height required (pit floor to clear under roof) is:
    For up to 100 FPM: (2) x (FL to FL travel) + 2′-6″.
    For 100 FPM and over: (2) x (FL to FL travel) + 3’8″.If total hoistway height is not sufficient, (2) holes can be provided to make up required dimension. In this case, add an additional 6″ to required height.
    For up to 100 FPM – add 3′-0″ in lieu of 2′-6″.
    For 100 FPM and over – add 4′-2″ in lieu of 3′-8″.
    (If “open” holes are provided – jack unit sits on pad at bottom of hole – do not add additional 6″.)
    Note that clear overhead as required by code must always be maintained.
    For example:
  • Speeds available to 150 FPM.
  • Contact factory for travel over 30 ft.
NOTES:

  1. Adequate supports for rail fastenings are required at all rail bracket locations (14′ maximum spacing) Concrete or block walls are recommended for support. Inserts should be furnished in block or brick walls. Block walls should be filled with mortar around inserts to provide rigid support.
  2. Pit and overhead clearances shown are in accordance with ANSI code requirements.
  3. A pit ladder (by others) is required if pit depth exceeds 36″ (Rule 106.1d).
  4. Leave 30″ square hole in pit floor (see elevator contractor representative for location) for jack unit installation. Hole to be grouted in by others after jack unit is set in place.
  5. Top of hatch must be vented in accordance with building codes.
  6. A 110V GFI outlet and light are required in the pit.
  7. Hoist beam to be removed by others after elevator installation, if minimum cab clearance is not available.

Front  Opening

Dimensions Capacity
4000# 4500# 5000#
HW 7′-4″ 7′-6″ 8′-3″
HD 9′-6″ 9′-11″ 10′-5″
CW 6′-0″ 6′-0″ 6′-0″
CD 8′-8″ 9′-1″ 9′-7″
ICW 5′-8″ 5′-8″ 5′-8″
ICD 7′-8″ 8′-1″ 8′-7″
X 11″ 13″ 13″
Clear Door Opening 4′-0″ 4′-0″ 4′-6″

Front And Rear Opening

Dimensions Capacity
4000# 4500#  5000#
HW 7′-4″ 7′-6″  8′-3″
HD 10′-7½” 11′-0½”  11′-6½”
CW 6′-0″ 6′-0″  6′-0″
CD 9′-4″ 9′-9″  10′-3″
ICW 5′-8″ 5′-8″  5′-8″
ICD 7′-8″ 8′-1″  8′-7″
X 11″ 13″  13″
Clear Door Opening 4′-0″ 4′-0″  4′-6″

* All cars comply with NEII recommendations for minimum handicap size.

Warning Hoistway dimensions shown are for preliminary planning purposes only.  Do not use these dimensions for hoistway construction.  All dimensions must be verified with Canton Elevator Inc. prior to construction.  Local code variations and code year adoptions may affect the hoistway size.

Machine Room

  1. An area of 5′-6″ x 7′-0″ x 8′-0″ high is usually adequate for single car installations,with 3′-0″ wide door opening for access.
  2. Recommended location is adjacent to elevator hoistway at lowest landing; however, it can be remotely located – and at any level – if necessary.
  3. Adequate heating and ventilation to meet code requirements must be provided.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s